Łódź bridge heave

by

The site of the new bridge on April 18 2013. Video BTWT.

Lodz is investing heavily in new roads in anticipation of many more motor vehicles coming into town when the new A1 motorway is completed.

If the same pattern is repeated in Lodz as has happened elsewhere the new roads will persuade even more people to abandon public transport and take to their cars adding yet another twist to the spiral: new roads –> more cars –> more road congestion and air pollution.

mapa_gorna

The Gorna area of Lodz. Map OpenStreetMap.

(Click on map to see a larger area of Lodz to a larger scale.)

One of the roads being built is the missing piece of the southern end of Lodz’s inner by-pass, between al. Jana Pawła II and ul. Szeroka, straightening out a kink at the point where the (1) trunk road reaches the city’s road grid.

This communist-era project was postponed for many years because of the cost of constructing a long railway viaduct so that the new road could dive under the railway line at an acute angle.

Wiadukt-1264

Approaching the new bridge on 26 April. Photo BTWT.

While several new roads at the southern end of the city will tempt motorists and HGV drivers to take the al. Wlokniarzy inner by-pass, the road building budget did not stretch to putting in corresponding improvements at the northern end of the city where the inner by-pass stops near Helenowek, a heavily built up area. Residents here already suffer from appalling congestion all along the (1) road to Zgierz.

Sadly the ‘Lodz Regional Tramway’, which was supposed to run all the way to Zgierz and could have helpd to cut motor traffic, stops at Helenowek as well.

Wiadukt-1266

Next to the bridge, the temporary bases are being demolished.

The biggest civil engineering work on the new road was the construction of a 141 m long steel viaduct to take the existing railway line across the new road. During the last eight months trains crept past the construction site while the abutments for the new bridge were constructed under the operational railway track. In addition temporary concrete supports were built to the north of the railway track and the new bridge – which had arrived as a kit of parts – was welded together on these supports.

When the bridge was ready, the track bed was ballasted and railway track laid. Then during a 68 hour possession from Friday 19 April to Sunday 21 April the old railway track was dismantled and sufficient earthworks removed to enable the new bridge to be slid into place. Technical inspections were held on the Sunday evening and trains began running again on Monday 22 April.

Wiadukt-1270

Heavy concrete breaking tractors. All photos BTWT.

On Saturday afternoon,  the Mayor of Lodz, Hanna Zdanowska called a press conference at the building site to enable the media to photograph the new bridge being slid into place. Given the importance of the event Wojciech Pater, the chairman of Mosty Lodz was leaving nothing to chance and arranged for his men to start the move at 07:00 hrs on Saturday morning.

When all was ready the hydraulic rams were pressurised, one failed, but the others were more than sufficient to keep the bridge moving. When you have 7,000 tons of bridge, ballast and railway track moving in the right direction you do not stop for anyone, not even the Mayor of Lodz. Four hours later the move was finished.

So it happened that when the mayor, her followers and the press gathered to photograph the historic event, the new bridge was already sitting proudly in place. It had been positioned to an accuracy of ± 0.2mm, whereas the design tolerance allowed for ± 10.0mm. One hopes that after the appropriate hydraulic fluids were dispensed the media displayed the same degree of tolerance as well.

More:

Photography:

  • The photos and video were filmed on an iPhone 4; the video was edited and rendered using Final Cut Pro 7 running on an ancient quad core G5 Power Mac. The two minutes of film took 4 hours to render!

Music:

  • The music used for the video is from the track How Long has the Train Been Gone on the Album To Forget An Actor by the London-based band Tranquilizers. If you liked what you hear, why not buy the track or even the whole album from here!
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s